Traceable bid analysis, substantiated awards, secured procedures — and time given back to teams that have none to spare. With one absolute rule, written into our tools and our training alike: the tool prepares, the public buyer decides.
From 21 August 2026, under France's Climate and Resilience law, every public tender must factor the environmental dimension into its award criteria. Many authorities are not ready yet — understandably: nobody tooled you up for it.
We prepare your tenders for the deadline, concretely:
criteria and weightings adapted to your contracts · a team trained to apply them traceably, with the safeguards of public procurement. Before the deadline, not after the first legal challenge.
Pre-analyse, install and train, maintain — the same programme as for industry, adapted to your procedures.
A quantified photograph of your contracts and spend, which can draw on France's open public-procurement data. A reading of your public data can be presented in a meeting, in the language of elected officials.
Assistants configured to your procedures — on European infrastructure, sovereign where required — and a team trained on its own contracts.
Assistants kept sharp over time — and an experienced buyer when the file justifies it.
The fear is legitimate: a poorly mastered tool is one more risk. Our approach does the opposite — everything is prepared with the safeguards of public procurement, on what the administrative judge looks at.
Every analysis can be documented: the announced criteria stay the applied criteria. Something to back your choices.
Analysis reports and letters to unsuccessful candidates that are consistent and evidenced — careful substantiation that secures your decisions.
Consistency across documents and points of vigilance on procedures: something to limit the classic errors before publication.
And at every step, the last word belongs to the public buyer. The tool never picks a winner — it prepares the work that lets you choose, quickly and cleanly.
Our services — pre-analysis, training, support — fit within France's procedure-free threshold for public purchases (in force since 1 April 2026). A quote and a purchase order are enough, within your internal rules and threshold computation.
For projects that qualify as innovative purchases, the French public procurement code provides a specific exemption (article R. 2122-9-1). We provide the "innovative purchase" characterisation note, built on the official grid, ready for your file.
On the data side: your documents are processed on European infrastructure, with a sovereign option (SecNumCloud-qualified French cloud) for the files that demand it. Our confidentiality architecture, in detail →
A consultation to launch, a bid analysis coming up, the 21 August deadline to prepare: tell us where you stand — we get back to you within one business day.
Thank you — noted. We will get back to you within one business day.